The Loeches sludge composting and thermal drying plant treats an annual average of 70,000 tons of sludge from Canal Isabel II wastewater treatment plants and generates electricity for self-consumption.
In the development of the Sewage Sludge Treatment Plant, GOC performed the following activities:
- Technical assistance, control and supervision of work
- Health and Safety Coordination
- Energy Efficiency Studies and Audits
- Final functional tests
- Execution Project Control
![Sludge treatment plant (Loeches, Madrid) 1 loeches 1](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img,w_927,h_438/https://www.gocsa.es/wp-content/uploads/2023/05/loeches-1.jpg)
![Sludge treatment plant (Loeches, Madrid) 2 MAC FOTO 090326 0201](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img,w_1024,h_683/https://www.gocsa.es/wp-content/uploads/2023/05/MAC-FOTO-090326-0201.jpg)
![Sludge treatment plant (Loeches, Madrid) 3 planta loeches](https://sp-ao.shortpixel.ai/client/to_webp,q_glossy,ret_img,w_763,h_501/https://www.gocsa.es/wp-content/uploads/2023/05/planta_loeches.jpg)